What Sets the Pace

  • The unit's condition at move-out, and how long the last resident lived there.
  • The building's age, and what has to be repaired or replaced.
  • Who does the work: your maintenance team, outside vendors, or both.
  • The order of the work. A vendor who arrives before the last trade finishes has to come back.

The Make-Ready, Step by Step

  1. Inspect the unit after move-out and write the scope.
  2. Clear anything left behind, and change the lock.
  3. Finish repairs and paint.
  4. Clean the unit, then clean or replace the carpet.
  5. Walk the unit once more before the move-in.

Where the Days Go

A turn slows down each time someone waits: on a scope nobody wrote before move-out, on a vendor nobody booked, on a part nobody ordered. Each wait can cost a day, and the days add up across every unit you turn.

Five Ways to Shorten the Turn

  1. Inspect before move-out. Walk the unit within a week of the resident's notice, so you can order parts and book vendors while the unit is still occupied.
  2. Book each vendor to the move-out date. Give every vendor a day in the order the turn needs, before the unit is empty.
  3. Track every unit on one board. List the move-out date, each step and the move-in date, so anyone on your team can see what's holding a unit.
  4. Spread out move-out dates where your leases allow it, so turns don't pile up in the same week.
  5. Finish a day before the move-in. That leaves time for a final walk, and for a fix if the walk finds something.

What a Slow Turn Costs

Each day a unit sits unready is a day of rent you can't collect. For a quick estimate, divide the monthly rent by 30 and multiply by the days past your target.

How Core Vendor Solutions Helps

Send us your move-out dates and the scope for each unit type. We line up each vendor in the order the turn needs, keep the schedule as dates change, and follow every job to completion. Vendors mark each job complete in the client portal with photos, so your team can confirm the unit or report an issue. Your team keeps one contact for every turn, across Turnover Cleaning, Unit Cleanouts and Bulk Removal, and Maintenance and Contracted Work.

Before any placement, Core Vendor Solutions LLC collects a signed vendor agreement, a current certificate of insurance, a W-9, and the applicable license documentation, and shares copies with the property for its own review.

Each vendor gives the property a written quote. The property approves it and pays the vendor directly for the work it orders. Your property pays the vendor for the work and pays Core Vendor Solutions nothing. The vendor pays Core Vendor Solutions 10% of gross receipts for the work we coordinate, including licensed services.

Questions About Turnover Time

Is seven working days a good target?

It's a common planning figure. Many teams aim for five, and some for three. Set a target for each unit type and condition, then track how often you hit it.

Should we count working days or calendar days?

Count working days for your team's target, and calendar days for what the vacancy costs you.

What if a vendor misses their day in the turn?

Confirm the miss, get a firm time or send a backup, and tell the people who are waiting. The full steps are in When a Vendor Doesn't Show.